Japanese Government Procurement
HokkaidoPhase III Reconstruction of the existing building of the Sapporo Medical University Hospital, a steel-framed reinforced concrete building with 13 stories above the ground, 3 basement floors, and a two-story rooftop structure. The total floor area is 92,631.99 m2
Publishing date | Oct 23, 2020 |
---|---|
Procurement entity | Hokkaido(Hokkaido) |
Classification |
0041 Construction Services |
Summary of notice |
Summary A Nature and quantity of the services to be procured: Phase III Reconstruction of the existing building of the Sapporo Medical University Hospital, a steel-framed reinforced concrete building with 13 stories above the ground, 3 basement floors, and a two-story rooftop structure. The total floor area is 92,631.99 m2 B Bid tendering date and time: 1:30 P.M., January 12, 2021 C Contact point for the notice: Construct Group, Planning and Management Division, Bureau of Public Buildings, Department of Construction, Hokkaido Government, Kita 3-jo Nishi 6-chome, Chuo-ku, Sapporo 060-8588 Japan Phone: 011-231-4111 (Ext. 29-862) |